Terminal T2 at Mumbai International Airport is an excellent example of successful ‘Public-Private Partnership” between the Government and the GVK Group, which designed, built and currently operates the Airport. The ’Art Wall’ is an integral part of the Terminal building plan. It runs along the entire outer periphery of the central processor building, and measures 300 metres in length, and over 4 levels – 21 metres – in height. Thus, the art wall is seen from all levels throughout the passenger circulation area, to and from the boarding gates. https://www.codaworx.com/project/jaya-he-gvk-new-museum-terminal-chhatrapati-shivaji-international-airport-mumbai-mumbai-international-airport-limited